← Back to the map

13TH MILE LIGHT INDUSTRY PARK

Bahagian Kuching, Sarawak · Industrial · 5 recorded sales, Jul 2024 to Nov 2025

Thinly traded · 2 sales in 12 monthsSemi-Detached Factory/Warehouse · 5
RM 322psf median, against main floor area · 5 priced sales
Not matched to a map location. NAPIC publishes no coordinates, so a project is placed by matching its name against OpenStreetMap; this one has no match yet. Every price on this page is unaffected.

The record

Middle half (25th–75th)
RM 322487 psf
Median price
RM 860,000
Price range
RM 860kRM 1.30m
Main floor area
2,6692,670 sq ft
Land area
7,0217,022 sq ft
Median price per sq ft of land
RM 123

Median of 5 sales that carry a usable area, out of 5 on record. Half the sales fell inside the middle-half band; half did not.

Land is published separately from main floor area and is the larger of the two here — a median of 7,021 sq ft against 2,669. Two houses can share a floor area and differ by half their land, so the price per square foot of the building is not by itself a comparison between them.

Liquidity

2 sales in the 12 months to Nov 2025. Last on record: 11 Nov 2025.

Counted against the newest sale in the corpus, not against today: NAPIC runs about three months in arrears, so a window ending today would quietly be a nine-month window and read low.

20243 · RM 322 psf
20252 · RM 487 psf

Quarterly medians · not a price trend

3024055072024 Q3 — RM 322 psf, 3 sales2025 Q4 — RM 487 psf, 2 sales
2024 Q32025 Q4
5+ sales in the quarterfewer — plotted, never joinedNo run of 3 quarters is dense enough to draw a line through.

Each point is the median psf of what sold that quarter, so it moves with the mix as much as with price — a quarter in which the larger units happened to change hands reads low per square foot without anything having got cheaper. A line is drawn only along a run of three or more consecutive quarters that each carry five or more sales — two points are a difference, not a direction.

There is no mix-adjusted series for industrial in Sarawak long or clean enough to state a direction, so this page states none.

Distribution · 5 priced sales

RM 322–334 psf — 3 salesRM 334–346 psf — 0 salesRM 346–358 psf — 0 salesRM 358–369 psf — 0 salesRM 369–381 psf — 0 salesRM 381–393 psf — 0 salesRM 393–405 psf — 0 salesRM 405–416 psf — 0 salesRM 416–428 psf — 0 salesRM 428–440 psf — 0 salesRM 440–452 psf — 0 salesRM 452–464 psf — 0 salesRM 464–475 psf — 0 salesRM 475–487 psf — 2 sales
RM 322RM 487 psf

Each bar counts sales in a RM 12 psf band, measured against main floor area. The axis is trimmed to the 2nd–98th percentile, so a handful of sales fall outside it; they are still counted in every figure above.

Most recent sales · 5 of 5

DateTypeArea (sq ft)PricepsfTenure
11 Nov 2025Semi-Detached Factory/Warehouse2,670RM 1,300,000487Leasehold
11 Nov 2025Semi-Detached Factory/Warehouse2,670RM 1,300,000487Leasehold
23 Jul 2024Semi-Detached Factory/Warehouse2,669RM 860,000322Leasehold
23 Jul 2024Semi-Detached Factory/Warehouse2,669RM 860,000322Leasehold
23 Jul 2024Semi-Detached Factory/Warehouse2,669RM 860,000322Leasehold

Others in Bahagian Kuching · industrial

Where these numbers come from

Every figure on this page is computed from registered transactions published by the National Property Information Centre (NAPIC), Valuation and Property Services Department (JPPH), Ministry of Finance Malaysia, as open data. These are completed sales, not asking prices, and not properties currently on the market.
Areas are as published: main floor area. Nothing here is a valuation.