← Back to the map

GREATYEAR CAPITAL IND PARK

Gombak, Selangor · Industrial · 5 recorded sales, May 2021 to Jun 2023

No sale recorded since Jun 2023Terraced Factory/Warehouse · 5
RM 135psf median, against main floor area · 5 priced sales
Not matched to a map location. NAPIC publishes no coordinates, so a project is placed by matching its name against OpenStreetMap; this one has no match yet. Every price on this page is unaffected.

The record

Middle half (25th–75th)
RM 124147 psf
Median price
RM 350,000
Price range
RM 230kRM 650k
Main floor area
2,5854,388 sq ft
Land area
2,0002,465 sq ft
Median price per sq ft of land
RM 175

Median of 5 sales that carry a usable area, out of 5 on record. Half the sales fell inside the middle-half band; half did not.

Land is published separately from main floor area and is the larger of the two here — a median of 2,000 sq ft against 2,585. Two houses can share a floor area and differ by half their land, so the price per square foot of the building is not by itself a comparison between them.

Liquidity

No recorded sale in the 12 months to Jun 2023. Last on record: 15 Jun 2023.

Counted against the newest sale in the corpus, not against today: NAPIC runs about three months in arrears, so a window ending today would quietly be a nine-month window and read low.

20211 · RM 147 psf
20223 · RM 124 psf
20231 · RM 135 psf

Quarterly medians · not a price trend

1011271532021 Q2 — RM 147 psf, 1 sale2022 Q1 — RM 148 psf, 1 sale2022 Q2 — RM 106 psf, 2 sales2023 Q2 — RM 135 psf, 1 sale
2021 Q22023 Q2
5+ sales in the quarterfewer — plotted, never joinedNo run of 3 quarters is dense enough to draw a line through.

Each point is the median psf of what sold that quarter, so it moves with the mix as much as with price — a quarter in which the larger units happened to change hands reads low per square foot without anything having got cheaper. A line is drawn only along a run of three or more consecutive quarters that each carry five or more sales — two points are a difference, not a direction.

There is no mix-adjusted series for industrial in Selangor long or clean enough to state a direction, so this page states none.

Distribution · 5 priced sales

RM 92–96 psf — 1 saleRM 96–100 psf — 0 salesRM 100–104 psf — 0 salesRM 104–108 psf — 0 salesRM 108–112 psf — 0 salesRM 112–116 psf — 0 salesRM 116–120 psf — 0 salesRM 120–124 psf — 1 saleRM 124–128 psf — 0 salesRM 128–132 psf — 0 salesRM 132–136 psf — 1 saleRM 136–140 psf — 0 salesRM 140–144 psf — 0 salesRM 144–148 psf — 2 sales
RM 92RM 148 psf

Each bar counts sales in a RM 4 psf band, measured against main floor area. The axis is trimmed to the 2nd–98th percentile, so a handful of sales fall outside it; they are still counted in every figure above.

Most recent sales · 5 of 5

DateTypeArea (sq ft)PricepsfTenure
15 Jun 2023Terraced Factory/Warehouse2,585RM 350,000135Freehold
11 May 2022Terraced Factory/Warehouse2,585RM 230,00089Freehold
12 Apr 2022Terraced Factory/Warehouse2,585RM 320,000124Leasehold
21 Jan 2022Terraced Factory/Warehouse4,388RM 650,000148Leasehold
12 May 2021Terraced Factory/Warehouse2,585RM 380,000147Leasehold

Tenure across all 5 sales: Leasehold 3 · Freehold 2.

Others in Gombak · industrial

Where these numbers come from

Every figure on this page is computed from registered transactions published by the National Property Information Centre (NAPIC), Valuation and Property Services Department (JPPH), Ministry of Finance Malaysia, as open data. These are completed sales, not asking prices, and not properties currently on the market.
Areas are as published: main floor area. Nothing here is a valuation.