← Back to the map

HOMELITE ECO PARK PHASE 2

Bahagian Miri, Sarawak · Landed · 6 recorded sales, Aug 2022 to Nov 2025

Thinly traded · 2 sales in 12 months2 - 2 1/2 Storey Terraced · 6
RM 270psf median, against main floor area · 6 priced sales
Not matched to a map location. NAPIC publishes no coordinates, so a project is placed by matching its name against OpenStreetMap; this one has no match yet. Every price on this page is unaffected.

The record

Middle half (25th–75th)
RM 269313 psf
Median price
RM 500,000
Price range
RM 480kRM 600k
Main floor area
1,7761,865 sq ft
Land area
2,3402,341 sq ft
Median price per sq ft of land
RM 214

Median of 6 sales that carry a usable area, out of 6 on record. Half the sales fell inside the middle-half band; half did not.

Land is published separately from main floor area and is the larger of the two here — a median of 2,340 sq ft against 1,776. Two houses can share a floor area and differ by half their land, so the price per square foot of the building is not by itself a comparison between them.

Liquidity

2 sales in the 12 months to Nov 2025. Last on record: 13 Nov 2025.

Counted against the newest sale in the corpus, not against today: NAPIC runs about three months in arrears, so a window ending today would quietly be a nine-month window and read low.

20222 · RM 270 psf
20232 · RM 268 psf
20252 · RM 332 psf

Quarterly medians · not a price trend

2613003402022 Q3 — RM 270 psf, 2 sales2023 Q3 — RM 268 psf, 2 sales2025 Q4 — RM 332 psf, 2 sales
2022 Q32025 Q4
5+ sales in the quarterfewer — plotted, never joinedNo run of 3 quarters is dense enough to draw a line through.

Each point is the median psf of what sold that quarter, so it moves with the mix as much as with price — a quarter in which the larger units happened to change hands reads low per square foot without anything having got cheaper. A line is drawn only along a run of three or more consecutive quarters that each carry five or more sales — two points are a difference, not a direction.

There is no mix-adjusted series for landed in Sarawak long or clean enough to state a direction, so this page states none.

Distribution · 6 priced sales

RM 268–273 psf — 4 salesRM 273–278 psf — 0 salesRM 278–283 psf — 0 salesRM 283–288 psf — 0 salesRM 288–293 psf — 0 salesRM 293–298 psf — 0 salesRM 298–302 psf — 0 salesRM 302–307 psf — 0 salesRM 307–312 psf — 0 salesRM 312–317 psf — 0 salesRM 317–322 psf — 0 salesRM 322–327 psf — 1 saleRM 327–332 psf — 0 salesRM 332–337 psf — 1 sale
RM 268RM 337 psf

Each bar counts sales in a RM 5 psf band, measured against main floor area. The axis is trimmed to the 2nd–98th percentile, so a handful of sales fall outside it; they are still counted in every figure above.

Most recent sales · 6 of 6

DateTypeArea (sq ft)PricepsfTenure
13 Nov 20252 - 2 1/2 Storey Terraced1,776RM 600,000338Leasehold
8 Oct 20252 - 2 1/2 Storey Terraced1,776RM 580,000327Leasehold
9 Aug 20232 - 2 1/2 Storey Terraced1,865RM 500,000268Leasehold
9 Aug 20232 - 2 1/2 Storey Terraced1,865RM 500,000268Leasehold
9 Aug 20222 - 2 1/2 Storey Terraced1,776RM 480,000270Leasehold
9 Aug 20222 - 2 1/2 Storey Terraced1,776RM 480,000270Leasehold

Others in Bahagian Miri · landed

Where these numbers come from

Every figure on this page is computed from registered transactions published by the National Property Information Centre (NAPIC), Valuation and Property Services Department (JPPH), Ministry of Finance Malaysia, as open data. These are completed sales, not asking prices, and not properties currently on the market.
Areas are as published: main floor area. Nothing here is a valuation.