← Back to the map

JALAN SPRING

Bahagian Miri, Sarawak · Landed · 5 recorded sales, Jun 2022 to Jan 2026

Thinly traded · 1 sale in 12 months1 - 1 1/2 Storey Terraced · 22 - 2 1/2 Storey Semi-Detached · 21 - 1 1/2 Storey Semi-Detached · 1
RM 390psf median, against main floor area · 5 priced sales
Not matched to a map location. NAPIC publishes no coordinates, so a project is placed by matching its name against OpenStreetMap; this one has no match yet. Every price on this page is unaffected.

The record

Middle half (25th–75th)
RM 378390 psf
Median price
RM 450,000
Price range
RM 360kRM 700k
Main floor area
9231,854 sq ft
Land area
3,6214,158 sq ft
Median price per sq ft of land
RM 124

Median of 5 sales that carry a usable area, out of 5 on record. Half the sales fell inside the middle-half band; half did not.

Land is published separately from main floor area and is the larger of the two here — a median of 4,128 sq ft against 1,130. Two houses can share a floor area and differ by half their land, so the price per square foot of the building is not by itself a comparison between them.

Liquidity

1 sale in the 12 months to Jan 2026. Last on record: 16 Jan 2026.

Counted against the newest sale in the corpus, not against today: NAPIC runs about three months in arrears, so a window ending today would quietly be a nine-month window and read low.

20224 · RM 384 psf
20261 · RM 398 psf

Quarterly medians · not a price trend

3753884012022 Q2 — RM 390 psf, 2 sales2022 Q4 — RM 378 psf, 2 sales2026 Q1 — RM 398 psf, 1 sale
2022 Q22026 Q1
5+ sales in the quarterfewer — plotted, never joinedNo run of 3 quarters is dense enough to draw a line through.

Each point is the median psf of what sold that quarter, so it moves with the mix as much as with price — a quarter in which the larger units happened to change hands reads low per square foot without anything having got cheaper. A line is drawn only along a run of three or more consecutive quarters that each carry five or more sales — two points are a difference, not a direction.

There is no mix-adjusted series for landed in Sarawak long or clean enough to state a direction, so this page states none.

Distribution · 5 priced sales

RM 378–379 psf — 2 salesRM 379–380 psf — 0 salesRM 380–382 psf — 0 salesRM 382–383 psf — 0 salesRM 383–385 psf — 0 salesRM 385–386 psf — 0 salesRM 386–388 psf — 0 salesRM 388–389 psf — 0 salesRM 389–390 psf — 2 salesRM 390–392 psf — 0 salesRM 392–393 psf — 0 salesRM 393–395 psf — 0 salesRM 395–396 psf — 0 salesRM 396–398 psf — 1 sale
RM 378RM 398 psf

Each bar counts sales in a RM 1 psf band, measured against main floor area. The axis is trimmed to the 2nd–98th percentile, so a handful of sales fall outside it; they are still counted in every figure above.

Most recent sales · 5 of 5

DateTypeArea (sq ft)PricepsfTenure
16 Jan 20261 - 1 1/2 Storey Semi-Detached1,130RM 450,000398Leasehold
7 Nov 20222 - 2 1/2 Storey Semi-Detached1,854RM 700,000378Leasehold
7 Nov 20222 - 2 1/2 Storey Semi-Detached1,854RM 700,000378Leasehold
14 Jun 20221 - 1 1/2 Storey Terraced923RM 360,000390Leasehold
14 Jun 20221 - 1 1/2 Storey Terraced923RM 360,000390Leasehold

Others in Bahagian Miri · landed

Where these numbers come from

Every figure on this page is computed from registered transactions published by the National Property Information Centre (NAPIC), Valuation and Property Services Department (JPPH), Ministry of Finance Malaysia, as open data. These are completed sales, not asking prices, and not properties currently on the market.
Areas are as published: main floor area. Nothing here is a valuation.