← Back to the map

RAKR SEDC 111

Dungun, Terengganu · Landed · 6 recorded sales, Sep 2022 to Dec 2025

Thinly traded · 1 sale in 12 monthsLow-Cost House · 6
RM 143psf median, against main floor area · 6 priced sales
Not matched to a map location. NAPIC publishes no coordinates, so a project is placed by matching its name against OpenStreetMap; this one has no match yet. Every price on this page is unaffected.

The record

Middle half (25th–75th)
RM 139158 psf
Median price
RM 135,000
Price range
RM 100kRM 200k
Main floor area
6201,000 sq ft
Land area
1,3691,411 sq ft
Median price per sq ft of land
RM 96

Median of 6 sales that carry a usable area, out of 6 on record. Half the sales fell inside the middle-half band; half did not.

Land is published separately from main floor area and is the larger of the two here — a median of 1,395 sq ft against 842. Two houses can share a floor area and differ by half their land, so the price per square foot of the building is not by itself a comparison between them.

Liquidity

1 sale in the 12 months to Dec 2025. Last on record: 9 Dec 2025.

Counted against the newest sale in the corpus, not against today: NAPIC runs about three months in arrears, so a window ending today would quietly be a nine-month window and read low.

20221 · RM 307 psf
20231 · RM 138 psf
20242 · RM 146 psf
20252 · RM 143 psf

Quarterly medians · not a price trend

1092193282022 Q3 — RM 307 psf, 1 sale2023 Q3 — RM 138 psf, 1 sale2024 Q1 — RM 161 psf, 1 sale2024 Q3 — RM 130 psf, 1 sale2025 Q1 — RM 140 psf, 1 sale2025 Q4 — RM 146 psf, 1 sale
2022 Q32025 Q4
5+ sales in the quarterfewer — plotted, never joinedNo run of 3 quarters is dense enough to draw a line through.

Each point is the median psf of what sold that quarter, so it moves with the mix as much as with price — a quarter in which the larger units happened to change hands reads low per square foot without anything having got cheaper. A line is drawn only along a run of three or more consecutive quarters that each carry five or more sales — two points are a difference, not a direction.

There is no mix-adjusted series for landed in Terengganu long or clean enough to state a direction, so this page states none.

Distribution · 6 priced sales

RM 131–142 psf — 3 salesRM 142–154 psf — 1 saleRM 154–166 psf — 1 saleRM 166–177 psf — 0 salesRM 177–189 psf — 0 salesRM 189–200 psf — 0 salesRM 200–212 psf — 0 salesRM 212–223 psf — 0 salesRM 223–235 psf — 0 salesRM 235–246 psf — 0 salesRM 246–258 psf — 0 salesRM 258–270 psf — 0 salesRM 270–281 psf — 0 salesRM 281–293 psf — 1 sale
RM 131RM 293 psf

Each bar counts sales in a RM 12 psf band, measured against main floor area. The axis is trimmed to the 2nd–98th percentile, so a handful of sales fall outside it; they are still counted in every figure above.

Most recent sales · 6 of 6

DateTypeArea (sq ft)PricepsfTenure
9 Dec 2025Low-Cost House958RM 140,000146Leasehold
20 Mar 2025Low-Cost House1,000RM 140,000140Leasehold
18 Aug 2024Low-Cost House1,000RM 130,000130Leasehold
13 Feb 2024Low-Cost House620RM 100,000161Leasehold
20 Aug 2023Low-Cost House725RM 100,000138Leasehold
27 Sep 2022Low-Cost House651RM 200,000307Leasehold

Others in Dungun · landed

Where these numbers come from

Every figure on this page is computed from registered transactions published by the National Property Information Centre (NAPIC), Valuation and Property Services Department (JPPH), Ministry of Finance Malaysia, as open data. These are completed sales, not asking prices, and not properties currently on the market.
Areas are as published: main floor area. Nothing here is a valuation.