← Back to the map

TMN CHERRY

Kinta, Perak · Landed · 13 recorded sales, Nov 2021 to Sep 2025

Thinly traded · 1 sale in 12 months1 - 1 1/2 Storey Terraced · 9Industrial Unit · 4
RM 200psf median, against main floor area · 9 priced sales
© CARTO · © OpenStreetMap

The record

Middle half (25th–75th)
RM 143222 psf
Median price
RM 180,000
Price range
RM 100kRM 350k
Main floor area
1,1061,370 sq ft
Land area
1,0981,876 sq ft
Median price per sq ft of land
RM 137

Median of 9 sales that carry a usable area, out of 13 on record — NAPIC published no area for the other 4, so they have no psf. Half the sales fell inside the middle-half band; half did not.

Land is published separately from main floor area and is the larger of the two here — a median of 1,680 sq ft against 1,151. Two houses can share a floor area and differ by half their land, so the price per square foot of the building is not by itself a comparison between them.

Liquidity

1 sale in the 12 months to Sep 2025. Last on record: 4 Sep 2025.

Counted against the newest sale in the corpus, not against today: NAPIC runs about three months in arrears, so a window ending today would quietly be a nine-month window and read low.

20213 · RM 143 psf
20223 · RM 139 psf
20234 · RM 211 psf
20242 · RM 248 psf
20251 · RM 190 psf

Quarterly medians · not a price trend

1242002752021 Q4 — RM 143 psf, 3 sales2022 Q1 — RM 139 psf, 1 sale2023 Q1 — RM 222 psf, 1 sale2023 Q2 — RM 200 psf, 1 sale2024 Q1 — RM 261 psf, 1 sale2024 Q4 — RM 235 psf, 1 sale2025 Q3 — RM 190 psf, 1 sale
2021 Q42025 Q3
5+ sales in the quarterfewer — plotted, never joinedNo run of 3 quarters is dense enough to draw a line through.

Each point is the median psf of what sold that quarter, so it moves with the mix as much as with price — a quarter in which the larger units happened to change hands reads low per square foot without anything having got cheaper. A line is drawn only along a run of three or more consecutive quarters that each carry five or more sales — two points are a difference, not a direction.

There is no mix-adjusted series for landed in Perak long or clean enough to state a direction, so this page states none.

Distribution · 9 priced sales

RM 140–148 psf — 3 salesRM 148–156 psf — 0 salesRM 156–165 psf — 0 salesRM 165–173 psf — 0 salesRM 173–181 psf — 0 salesRM 181–190 psf — 0 salesRM 190–198 psf — 1 saleRM 198–206 psf — 1 saleRM 206–215 psf — 1 saleRM 215–223 psf — 1 saleRM 223–231 psf — 0 salesRM 231–240 psf — 1 saleRM 240–248 psf — 0 salesRM 248–256 psf — 1 sale
RM 140RM 256 psf

Each bar counts sales in a RM 8 psf band, measured against main floor area. The axis is trimmed to the 2nd–98th percentile, so a handful of sales fall outside it; they are still counted in every figure above.

Most recent sales · 13 of 13

DateTypeFloorArea (sq ft)PricepsfTenure
4 Sep 20251 - 1 1/2 Storey Terraced1,370RM 260,000190Freehold
1 Oct 20241 - 1 1/2 Storey Terraced1,151RM 270,000235Freehold
1 Mar 20241 - 1 1/2 Storey Terraced1,343RM 350,000261Freehold
17 Oct 2023Industrial Unit1RM 180,000Freehold
3 Oct 2023Industrial Unit1RM 100,000Freehold
9 Jun 20231 - 1 1/2 Storey Terraced1,151RM 230,000200Freehold
2 Mar 20231 - 1 1/2 Storey Terraced1,106RM 245,000222Freehold
21 Nov 2022Industrial Unit1RM 125,000Freehold
4 Mar 20221 - 1 1/2 Storey Terraced1,151RM 160,000139Freehold
3 Feb 2022Industrial Unit2RM 125,000Freehold
28 Dec 20211 - 1 1/2 Storey Terraced1,151RM 165,000143Freehold
28 Dec 20211 - 1 1/2 Storey Terraced1,151RM 165,000143Freehold
24 Nov 20211 - 1 1/2 Storey Terraced1,151RM 240,000209Freehold

Others in Kinta · landed

Where these numbers come from

Every figure on this page is computed from registered transactions published by the National Property Information Centre (NAPIC), Valuation and Property Services Department (JPPH), Ministry of Finance Malaysia, as open data. These are completed sales, not asking prices, and not properties currently on the market.
Areas are as published: main floor area. Nothing here is a valuation.