← Back to the map

TMN INDUSTRI RINGAN BROLEH

Batu Pahat, Johor · Industrial · 6 recorded sales, May 2023 to Jan 2026

Thinly traded · 1 sale in 12 monthsTerraced Factory/Warehouse · 6
RM 207psf median, against main floor area · 6 priced sales
Not matched to a map location. NAPIC publishes no coordinates, so a project is placed by matching its name against OpenStreetMap; this one has no match yet. Every price on this page is unaffected.

The record

Middle half (25th–75th)
RM 185270 psf
Median price
RM 600,000
Price range
RM 513kRM 970k
Main floor area
2,8932,896 sq ft
Land area
2,4004,844 sq ft
Median price per sq ft of land
RM 207

Median of 6 sales that carry a usable area, out of 6 on record. Half the sales fell inside the middle-half band; half did not.

Land is published separately from main floor area and is the larger of the two here — a median of 2,761 sq ft against 2,893. Two houses can share a floor area and differ by half their land, so the price per square foot of the building is not by itself a comparison between them.

Liquidity

1 sale in the 12 months to Jan 2026. Last on record: 8 Jan 2026.

Counted against the newest sale in the corpus, not against today: NAPIC runs about three months in arrears, so a window ending today would quietly be a nine-month window and read low.

20233 · RM 290 psf
20252 · RM 177 psf
20261 · RM 207 psf

Quarterly medians · not a price trend

1582563542023 Q2 — RM 335 psf, 1 sale2023 Q3 — RM 207 psf, 1 sale2023 Q4 — RM 290 psf, 1 sale2025 Q1 — RM 177 psf, 2 sales2026 Q1 — RM 207 psf, 1 sale
2023 Q22026 Q1
5+ sales in the quarterfewer — plotted, never joinedNo run of 3 quarters is dense enough to draw a line through.

Each point is the median psf of what sold that quarter, so it moves with the mix as much as with price — a quarter in which the larger units happened to change hands reads low per square foot without anything having got cheaper. A line is drawn only along a run of three or more consecutive quarters that each carry five or more sales — two points are a difference, not a direction.

There is no mix-adjusted series for industrial in Johor long or clean enough to state a direction, so this page states none.

Distribution · 6 priced sales

RM 177–188 psf — 2 salesRM 188–199 psf — 0 salesRM 199–210 psf — 2 salesRM 210–221 psf — 0 salesRM 221–232 psf — 0 salesRM 232–243 psf — 0 salesRM 243–254 psf — 0 salesRM 254–265 psf — 0 salesRM 265–276 psf — 0 salesRM 276–287 psf — 0 salesRM 287–298 psf — 1 saleRM 298–309 psf — 0 salesRM 309–320 psf — 0 salesRM 320–331 psf — 1 sale
RM 177RM 331 psf

Each bar counts sales in a RM 11 psf band, measured against main floor area. The axis is trimmed to the 2nd–98th percentile, so a handful of sales fall outside it; they are still counted in every figure above.

Most recent sales · 6 of 6

DateTypeArea (sq ft)PricepsfTenure
8 Jan 2026Terraced Factory/Warehouse2,896RM 600,000207Freehold
3 Feb 2025Terraced Factory/Warehouse2,893RM 512,500177Freehold
3 Feb 2025Terraced Factory/Warehouse2,893RM 512,500177Freehold
4 Oct 2023Terraced Factory/Warehouse2,893RM 840,000290Freehold
4 Aug 2023Terraced Factory/Warehouse2,893RM 600,000207Freehold
3 May 2023Terraced Factory/Warehouse2,893RM 970,000335Freehold

Others in Batu Pahat · industrial

Where these numbers come from

Every figure on this page is computed from registered transactions published by the National Property Information Centre (NAPIC), Valuation and Property Services Department (JPPH), Ministry of Finance Malaysia, as open data. These are completed sales, not asking prices, and not properties currently on the market.
Areas are as published: main floor area. Nothing here is a valuation.