← Back to the map

TAMAN PERINDUSTRIAN GELAMA HULU YAM LAMA

Hulu Selangor, Selangor · Industrial · 9 recorded sales, Jan 2023 to Nov 2025

Thinly traded · 2 sales in 12 monthsTerraced Factory/Warehouse · 9
RM 334psf median, against main floor area · 9 priced sales
Not matched to a map location. NAPIC publishes no coordinates, so a project is placed by matching its name against OpenStreetMap; this one has no match yet. Every price on this page is unaffected.

The record

Middle half (25th–75th)
RM 315372 psf
Median price
RM 988,000
Price range
RM 798kRM 1.52m
Main floor area
2,3904,852 sq ft
Land area
1,6042,917 sq ft
Median price per sq ft of land
RM 554

Median of 9 sales that carry a usable area, out of 9 on record. Half the sales fell inside the middle-half band; half did not.

Land is published separately from main floor area and is the larger of the two here — a median of 1,765 sq ft against 2,390. Two houses can share a floor area and differ by half their land, so the price per square foot of the building is not by itself a comparison between them.

Liquidity

2 sales in the 12 months to Nov 2025. Last on record: 14 Nov 2025.

Counted against the newest sale in the corpus, not against today: NAPIC runs about three months in arrears, so a window ending today would quietly be a nine-month window and read low.

20236 · RM 325 psf
20241 · RM 368 psf
20252 · RM 393 psf

Quarterly medians · not a price trend

3033534022023 Q1 — RM 334 psf, 2 sales2023 Q2 — RM 313 psf, 3 sales2023 Q4 — RM 393 psf, 1 sale2024 Q2 — RM 368 psf, 1 sale2025 Q4 — RM 393 psf, 2 sales
2023 Q12025 Q4
5+ sales in the quarterfewer — plotted, never joinedNo run of 3 quarters is dense enough to draw a line through.

Each point is the median psf of what sold that quarter, so it moves with the mix as much as with price — a quarter in which the larger units happened to change hands reads low per square foot without anything having got cheaper. A line is drawn only along a run of three or more consecutive quarters that each carry five or more sales — two points are a difference, not a direction.

There is no mix-adjusted series for industrial in Selangor long or clean enough to state a direction, so this page states none.

Distribution · 9 priced sales

RM 313–320 psf — 3 salesRM 320–327 psf — 0 salesRM 327–334 psf — 0 salesRM 334–341 psf — 2 salesRM 341–348 psf — 0 salesRM 348–355 psf — 0 salesRM 355–362 psf — 0 salesRM 362–369 psf — 1 saleRM 369–375 psf — 1 saleRM 375–382 psf — 0 salesRM 382–389 psf — 0 salesRM 389–396 psf — 1 saleRM 396–403 psf — 0 salesRM 403–410 psf — 1 sale
RM 313RM 410 psf

Each bar counts sales in a RM 7 psf band, measured against main floor area. The axis is trimmed to the 2nd–98th percentile, so a handful of sales fall outside it; they are still counted in every figure above.

Most recent sales · 9 of 9

DateTypeArea (sq ft)PricepsfTenure
14 Nov 2025Terraced Factory/Warehouse2,390RM 988,000414Leasehold
14 Nov 2025Terraced Factory/Warehouse2,390RM 888,000372Leasehold
16 Apr 2024Terraced Factory/Warehouse3,798RM 1,398,000368Leasehold
31 Oct 2023Terraced Factory/Warehouse2,390RM 938,000393Leasehold
6 Jun 2023Terraced Factory/Warehouse4,852RM 1,519,000313Leasehold
6 Jun 2023Terraced Factory/Warehouse4,852RM 1,519,000313Leasehold
6 Jun 2023Terraced Factory/Warehouse4,450RM 1,403,060315Leasehold
19 Jan 2023Terraced Factory/Warehouse2,390RM 798,000334Leasehold
19 Jan 2023Terraced Factory/Warehouse2,390RM 798,000334Leasehold

Others in Hulu Selangor · industrial

Where these numbers come from

Every figure on this page is computed from registered transactions published by the National Property Information Centre (NAPIC), Valuation and Property Services Department (JPPH), Ministry of Finance Malaysia, as open data. These are completed sales, not asking prices, and not properties currently on the market.
Areas are as published: main floor area. Nothing here is a valuation.