← Back to the map

COUNTRY HEIGHTS

Bahagian Kapit, Sarawak · Landed · 9 recorded sales, Mar 2023 to Jun 2025

No sale recorded since Jun 20252 - 2 1/2 Storey Semi-Detached · 42 - 2 1/2 Storey Terraced · 3Low-Cost House · 2
RM 224psf median, against main floor area · 9 priced sales
Not matched to a map location. NAPIC publishes no coordinates, so a project is placed by matching its name against OpenStreetMap; this one has no match yet. Every price on this page is unaffected.

The record

Middle half (25th–75th)
RM 192244 psf
Median price
RM 350,000
Price range
RM 120kRM 480k
Main floor area
4341,970 sq ft
Land area
1,1243,636 sq ft
Median price per sq ft of land
RM 129

Median of 9 sales that carry a usable area, out of 9 on record. Half the sales fell inside the middle-half band; half did not.

Land is published separately from main floor area and is the larger of the two here — a median of 3,564 sq ft against 1,924. Two houses can share a floor area and differ by half their land, so the price per square foot of the building is not by itself a comparison between them.

Liquidity

No recorded sale in the 12 months to Jun 2025. Last on record: 11 Jun 2025.

Counted against the newest sale in the corpus, not against today: NAPIC runs about three months in arrears, so a window ending today would quietly be a nine-month window and read low.

20236 · RM 192 psf
20242 · RM 250 psf
20251 · RM 330 psf

Quarterly medians · not a price trend

1592543482023 Q1 — RM 178 psf, 2 sales2023 Q2 — RM 218 psf, 4 sales2024 Q3 — RM 250 psf, 2 sales2025 Q2 — RM 330 psf, 1 sale
2023 Q12025 Q2
5+ sales in the quarterfewer — plotted, never joinedNo run of 3 quarters is dense enough to draw a line through.

Each point is the median psf of what sold that quarter, so it moves with the mix as much as with price — a quarter in which the larger units happened to change hands reads low per square foot without anything having got cheaper. A line is drawn only along a run of three or more consecutive quarters that each carry five or more sales — two points are a difference, not a direction.

There is no mix-adjusted series for landed in Sarawak long or clean enough to state a direction, so this page states none.

Distribution · 9 priced sales

RM 178–188 psf — 2 salesRM 188–198 psf — 2 salesRM 198–208 psf — 0 salesRM 208–219 psf — 0 salesRM 219–229 psf — 1 saleRM 229–239 psf — 0 salesRM 239–249 psf — 2 salesRM 249–260 psf — 0 salesRM 260–270 psf — 0 salesRM 270–280 psf — 1 saleRM 280–290 psf — 0 salesRM 290–301 psf — 0 salesRM 301–311 psf — 0 salesRM 311–321 psf — 1 sale
RM 178RM 321 psf

Each bar counts sales in a RM 10 psf band, measured against main floor area. The axis is trimmed to the 2nd–98th percentile, so a handful of sales fall outside it; they are still counted in every figure above.

Most recent sales · 9 of 9

DateTypeArea (sq ft)PricepsfTenure
11 Jun 2025Low-Cost House455RM 150,000330Leasehold
5 Aug 20242 - 2 1/2 Storey Terraced1,924RM 430,000224Leasehold
31 Jul 2024Low-Cost House434RM 120,000276Leasehold
30 Jun 20232 - 2 1/2 Storey Semi-Detached1,970RM 480,000244Leasehold
30 Jun 20232 - 2 1/2 Storey Semi-Detached1,970RM 480,000244Leasehold
8 May 20232 - 2 1/2 Storey Terraced1,722RM 330,000192Leasehold
8 May 20232 - 2 1/2 Storey Terraced1,722RM 330,000192Leasehold
27 Mar 20232 - 2 1/2 Storey Semi-Detached1,970RM 350,000178Leasehold
27 Mar 20232 - 2 1/2 Storey Semi-Detached1,970RM 350,000178Leasehold

Others in Bahagian Kapit · landed

Where these numbers come from

Every figure on this page is computed from registered transactions published by the National Property Information Centre (NAPIC), Valuation and Property Services Department (JPPH), Ministry of Finance Malaysia, as open data. These are completed sales, not asking prices, and not properties currently on the market.
Areas are as published: main floor area. Nothing here is a valuation.