← Back to the map

RUMAH PANGSA ALOR AKAR

Kuantan, Pahang · High-rise / strata · 7 recorded sales, Apr 2021 to Aug 2024

No sale recorded since Aug 2024Low-Cost Flat · 7
RM 137psf median, against built-up area · 7 priced sales
Not matched to a map location. NAPIC publishes no coordinates, so a project is placed by matching its name against OpenStreetMap; this one has no match yet. Every price on this page is unaffected.

The record

Middle half (25th–75th)
RM 128149 psf
Median price
RM 75,000
Price range
RM 23kRM 100k
Built-up area
525549 sq ft

Median of 7 sales that carry a usable area, out of 7 on record. Half the sales fell inside the middle-half band; half did not.

Liquidity

No recorded sale in the 12 months to Aug 2024. Last on record: 30 Aug 2024.

Counted against the newest sale in the corpus, not against today: NAPIC runs about three months in arrears, so a window ending today would quietly be a nine-month window and read low.

20211 · RM 133 psf
20221 · RM 146 psf
20233 · RM 124 psf
20242 · RM 144 psf

Quarterly medians · not a price trend

29971662021 Q2 — RM 133 psf, 1 sale2022 Q4 — RM 146 psf, 1 sale2023 Q1 — RM 153 psf, 2 sales2023 Q3 — RM 42 psf, 1 sale2024 Q3 — RM 144 psf, 2 sales
2021 Q22024 Q3
5+ sales in the quarterfewer — plotted, never joinedNo run of 3 quarters is dense enough to draw a line through.

Each point is the median psf of what sold that quarter, so it moves with the mix as much as with price — a quarter in which the larger units happened to change hands reads low per square foot without anything having got cheaper. A line is drawn only along a run of three or more consecutive quarters that each carry five or more sales — two points are a difference, not a direction.

There is no mix-adjusted series for high-rise / strata in Pahang long or clean enough to state a direction, so this page states none.

Distribution · 7 priced sales

RM 52–61 psf — 1 saleRM 61–70 psf — 0 salesRM 70–79 psf — 0 salesRM 79–88 psf — 0 salesRM 88–97 psf — 0 salesRM 97–106 psf — 0 salesRM 106–115 psf — 0 salesRM 115–124 psf — 1 saleRM 124–133 psf — 1 saleRM 133–142 psf — 1 saleRM 142–151 psf — 2 salesRM 151–160 psf — 0 salesRM 160–169 psf — 0 salesRM 169–178 psf — 1 sale
RM 52RM 178 psf

Each bar counts sales in a RM 9 psf band, measured against built-up area. The axis is trimmed to the 2nd–98th percentile, so a handful of sales fall outside it; they are still counted in every figure above.

Most recent sales · 7 of 7

DateTypeFloorArea (sq ft)PricepsfTenure
30 Aug 2024Low-Cost Flat2549RM 83,000151Leasehold
5 Jul 2024Low-Cost Flat5549RM 75,000137Leasehold
18 Sep 2023Low-Cost Flat5549RM 23,00042Leasehold
7 Mar 2023Low-Cost Flat2525RM 65,000124Leasehold
22 Feb 2023Low-Cost Flat4549RM 100,000182Leasehold
29 Dec 2022Low-Cost Flat2549RM 80,000146Leasehold
12 Apr 2021Low-Cost Flat5549RM 73,000133Leasehold

Others in Kuantan · high-rise / strata

Where these numbers come from

Every figure on this page is computed from registered transactions published by the National Property Information Centre (NAPIC), Valuation and Property Services Department (JPPH), Ministry of Finance Malaysia, as open data. These are completed sales, not asking prices, and not properties currently on the market.
Areas are as published: built-up area. Nothing here is a valuation.