← Back to the map

TMN PASIR PUTIH PH 3C (PUTATAN)

Putatan, Sabah · High-rise / strata · 10 recorded sales, Apr 2022 to Jul 2023

No sale recorded since Jul 2023Low-Cost Flat · 10
RM 283psf median, against built-up area · 10 priced sales
Not matched to a map location. NAPIC publishes no coordinates, so a project is placed by matching its name against OpenStreetMap; this one has no match yet. Every price on this page is unaffected.

The record

Middle half (25th–75th)
RM 269300 psf
Median price
RM 170,000
Price range
RM 150kRM 185k
Built-up area
600600 sq ft

Median of 10 sales that carry a usable area, out of 10 on record. Half the sales fell inside the middle-half band; half did not.

Liquidity

No recorded sale in the 12 months to Jul 2023. Last on record: 24 Jul 2023.

Counted against the newest sale in the corpus, not against today: NAPIC runs about three months in arrears, so a window ending today would quietly be a nine-month window and read low.

20227 · RM 283 psf
20233 · RM 283 psf

Quarterly medians · not a price trend

2622883132022 Q2 — RM 308 psf, 1 sale2022 Q3 — RM 267 psf, 3 sales2022 Q4 — RM 283 psf, 3 sales2023 Q1 — RM 275 psf, 1 sale2023 Q2 — RM 308 psf, 1 sale2023 Q3 — RM 283 psf, 1 sale
2022 Q22023 Q3
5+ sales in the quarterfewer — plotted, never joinedNo run of 3 quarters is dense enough to draw a line through.

Each point is the median psf of what sold that quarter, so it moves with the mix as much as with price — a quarter in which the larger units happened to change hands reads low per square foot without anything having got cheaper. A line is drawn only along a run of three or more consecutive quarters that each carry five or more sales — two points are a difference, not a direction.

There is no mix-adjusted series for high-rise / strata in Sabah long or clean enough to state a direction, so this page states none.

Distribution · 10 priced sales

RM 253–257 psf — 1 saleRM 257–261 psf — 0 salesRM 261–265 psf — 0 salesRM 265–269 psf — 2 salesRM 269–273 psf — 0 salesRM 273–277 psf — 1 saleRM 277–281 psf — 0 salesRM 281–285 psf — 2 salesRM 285–289 psf — 0 salesRM 289–293 psf — 0 salesRM 293–297 psf — 0 salesRM 297–300 psf — 2 salesRM 300–304 psf — 0 salesRM 304–308 psf — 2 sales
RM 253RM 308 psf

Each bar counts sales in a RM 4 psf band, measured against built-up area. The axis is trimmed to the 2nd–98th percentile, so a handful of sales fall outside it; they are still counted in every figure above.

Most recent sales · 10 of 10

DateTypeFloorArea (sq ft)PricepsfTenure
24 Jul 2023Low-Cost Flat3600RM 170,000283Leasehold
10 Apr 2023Low-Cost Flat1600RM 185,000308Leasehold
15 Feb 2023Low-Cost Flat4600RM 165,000275Leasehold
29 Dec 2022Low-Cost Flat2600RM 180,000300Leasehold
26 Oct 2022Low-Cost Flat2600RM 170,000283Leasehold
6 Oct 2022Low-Cost Flat2600RM 160,000267Leasehold
19 Sep 2022Low-Cost Flat3600RM 160,000267Leasehold
15 Jul 2022Low-Cost Flat4600RM 150,000250Leasehold
14 Jul 2022Low-Cost FlatG600RM 180,000300Leasehold
18 Apr 2022Low-Cost FlatG600RM 185,000308Leasehold

Others in Putatan · high-rise / strata

Where these numbers come from

Every figure on this page is computed from registered transactions published by the National Property Information Centre (NAPIC), Valuation and Property Services Department (JPPH), Ministry of Finance Malaysia, as open data. These are completed sales, not asking prices, and not properties currently on the market.
Areas are as published: built-up area. Nothing here is a valuation.