← Back to the map

TAMAN WAWASAN - TR 6

Segamat, Johor · Landed · 10 recorded sales, Dec 2021 to May 2024

No sale recorded since May 20241 - 1 1/2 Storey Terraced · 52 - 2 1/2 Storey Terraced · 4Low-Cost House · 1
RM 216psf median, against main floor area · 10 priced sales
Not matched to a map location. NAPIC publishes no coordinates, so a project is placed by matching its name against OpenStreetMap; this one has no match yet. Every price on this page is unaffected.

The record

Middle half (25th–75th)
RM 178248 psf
Median price
RM 172,500
Price range
RM 100kRM 260k
Main floor area
672902 sq ft
Land area
7752,347 sq ft
Median price per sq ft of land
RM 117

Median of 10 sales that carry a usable area, out of 10 on record. Half the sales fell inside the middle-half band; half did not.

Land is published separately from main floor area and is the larger of the two here — a median of 1,539 sq ft against 850. Two houses can share a floor area and differ by half their land, so the price per square foot of the building is not by itself a comparison between them.

Liquidity

No recorded sale in the 12 months to May 2024. Last on record: 10 May 2024.

Counted against the newest sale in the corpus, not against today: NAPIC runs about three months in arrears, so a window ending today would quietly be a nine-month window and read low.

20211 · RM 177 psf
20221 · RM 177 psf
20237 · RM 226 psf
20241 · RM 288 psf

Quarterly medians · not a price trend

1062073082021 Q4 — RM 177 psf, 1 sale2022 Q1 — RM 177 psf, 1 sale2023 Q1 — RM 277 psf, 1 sale2023 Q3 — RM 125 psf, 1 sale2023 Q4 — RM 226 psf, 5 sales2024 Q2 — RM 288 psf, 1 sale
2021 Q42024 Q2
5+ sales in the quarterfewer — plotted, never joinedNo run of 3 quarters is dense enough to draw a line through.

Each point is the median psf of what sold that quarter, so it moves with the mix as much as with price — a quarter in which the larger units happened to change hands reads low per square foot without anything having got cheaper. A line is drawn only along a run of three or more consecutive quarters that each carry five or more sales — two points are a difference, not a direction.

There is no mix-adjusted series for landed in Johor long or clean enough to state a direction, so this page states none.

Distribution · 10 priced sales

RM 135–146 psf — 1 saleRM 146–156 psf — 0 salesRM 156–167 psf — 0 salesRM 167–178 psf — 2 salesRM 178–189 psf — 1 saleRM 189–200 psf — 0 salesRM 200–211 psf — 1 saleRM 211–221 psf — 0 salesRM 221–232 psf — 2 salesRM 232–243 psf — 0 salesRM 243–254 psf — 0 salesRM 254–265 psf — 1 saleRM 265–275 psf — 0 salesRM 275–286 psf — 2 sales
RM 135RM 286 psf

Each bar counts sales in a RM 11 psf band, measured against main floor area. The axis is trimmed to the 2nd–98th percentile, so a handful of sales fall outside it; they are still counted in every figure above.

Most recent sales · 10 of 10

DateTypeArea (sq ft)PricepsfTenure
10 May 20241 - 1 1/2 Storey Terraced902RM 260,000288Freehold
26 Dec 2023Low-Cost House672RM 120,000179Freehold
20 Nov 20232 - 2 1/2 Storey Terraced798RM 180,000226Freehold
20 Nov 20232 - 2 1/2 Storey Terraced798RM 180,000226Freehold
16 Nov 20232 - 2 1/2 Storey Terraced798RM 165,000207Freehold
5 Nov 20231 - 1 1/2 Storey Terraced902RM 230,000255Freehold
11 Aug 20232 - 2 1/2 Storey Terraced798RM 100,000125Freehold
24 Feb 20231 - 1 1/2 Storey Terraced902RM 250,000277Freehold
5 Jan 20221 - 1 1/2 Storey Terraced902RM 160,000177Freehold
27 Dec 20211 - 1 1/2 Storey Terraced902RM 160,000177Freehold

Others in Segamat · landed

Where these numbers come from

Every figure on this page is computed from registered transactions published by the National Property Information Centre (NAPIC), Valuation and Property Services Department (JPPH), Ministry of Finance Malaysia, as open data. These are completed sales, not asking prices, and not properties currently on the market.
Areas are as published: main floor area. Nothing here is a valuation.