← Back to the map

TMN SERI TANJUNG

Melaka Tengah, Melaka · Landed · 8 recorded sales, Mar 2022 to Aug 2024

No sale recorded since Aug 20241 - 1 1/2 Storey Terraced · 41 - 1 1/2 Storey Semi-Detached · 2Detached · 2
RM 273psf median, against main floor area · 8 priced sales
© CARTO · © OpenStreetMap

The record

Middle half (25th–75th)
RM 226326 psf
Median price
RM 270,000
Price range
RM 150kRM 480k
Main floor area
8001,569 sq ft
Land area
1,1095,985 sq ft
Median price per sq ft of land
RM 123

Median of 8 sales that carry a usable area, out of 8 on record. Half the sales fell inside the middle-half band; half did not.

Land is published separately from main floor area and is the larger of the two here — a median of 2,217 sq ft against 1,065. Two houses can share a floor area and differ by half their land, so the price per square foot of the building is not by itself a comparison between them.

Liquidity

No recorded sale in the 12 months to Aug 2024. Last on record: 29 Aug 2024.

Counted against the newest sale in the corpus, not against today: NAPIC runs about three months in arrears, so a window ending today would quietly be a nine-month window and read low.

20223 · RM 250 psf
20234 · RM 340 psf
20241 · RM 188 psf

Quarterly medians · not a price trend

1642844032022 Q1 — RM 295 psf, 1 sale2022 Q2 — RM 238 psf, 1 sale2022 Q4 — RM 250 psf, 1 sale2023 Q1 — RM 280 psf, 2 sales2023 Q2 — RM 380 psf, 1 sale2023 Q4 — RM 312 psf, 1 sale2024 Q3 — RM 188 psf, 1 sale
2022 Q12024 Q3
5+ sales in the quarterfewer — plotted, never joinedNo run of 3 quarters is dense enough to draw a line through.

Each point is the median psf of what sold that quarter, so it moves with the mix as much as with price — a quarter in which the larger units happened to change hands reads low per square foot without anything having got cheaper. A line is drawn only along a run of three or more consecutive quarters that each carry five or more sales — two points are a difference, not a direction.

There is no mix-adjusted series for landed in Melaka long or clean enough to state a direction, so this page states none.

Distribution · 8 priced sales

RM 188–202 psf — 2 salesRM 202–215 psf — 0 salesRM 215–229 psf — 0 salesRM 229–242 psf — 1 saleRM 242–256 psf — 1 saleRM 256–270 psf — 0 salesRM 270–283 psf — 0 salesRM 283–297 psf — 1 saleRM 297–310 psf — 0 salesRM 310–324 psf — 1 saleRM 324–337 psf — 0 salesRM 337–351 psf — 0 salesRM 351–365 psf — 0 salesRM 365–378 psf — 2 sales
RM 188RM 378 psf

Each bar counts sales in a RM 14 psf band, measured against main floor area. The axis is trimmed to the 2nd–98th percentile, so a handful of sales fall outside it; they are still counted in every figure above.

Most recent sales · 8 of 8

DateTypeArea (sq ft)PricepsfTenure
29 Aug 20241 - 1 1/2 Storey Terraced800RM 150,000188Freehold
16 Oct 20231 - 1 1/2 Storey Semi-Detached1,089RM 340,000312Freehold
12 May 2023Detached1,263RM 479,800380Freehold
30 Mar 20231 - 1 1/2 Storey Terraced1,040RM 200,000192Freehold
8 Mar 20231 - 1 1/2 Storey Semi-Detached1,089RM 400,000367Freehold
25 Nov 20221 - 1 1/2 Storey Terraced800RM 200,000250Freehold
21 Jun 20221 - 1 1/2 Storey Terraced800RM 190,000238Freehold
16 Mar 2022Detached1,569RM 463,000295Freehold

Others in Melaka Tengah · landed

Where these numbers come from

Every figure on this page is computed from registered transactions published by the National Property Information Centre (NAPIC), Valuation and Property Services Department (JPPH), Ministry of Finance Malaysia, as open data. These are completed sales, not asking prices, and not properties currently on the market.
Areas are as published: main floor area. Nothing here is a valuation.