← Back to the map

TMN SRI JAYA FASA 1 & FASA 2

Baling, Kedah · Landed · 7 recorded sales, Jan 2022 to Jul 2024

No sale recorded since Jul 2024Low-Cost House · 61 - 1 1/2 Storey Terraced · 1
RM 223psf median, against main floor area · 7 priced sales
Not matched to a map location. NAPIC publishes no coordinates, so a project is placed by matching its name against OpenStreetMap; this one has no match yet. Every price on this page is unaffected.

The record

Middle half (25th–75th)
RM 169236 psf
Median price
RM 160,000
Price range
RM 80kRM 223k
Main floor area
6801,000 sq ft
Land area
1,3002,190 sq ft
Median price per sq ft of land
RM 107

Median of 7 sales that carry a usable area, out of 7 on record. Half the sales fell inside the middle-half band; half did not.

Land is published separately from main floor area and is the larger of the two here — a median of 1,400 sq ft against 700. Two houses can share a floor area and differ by half their land, so the price per square foot of the building is not by itself a comparison between them.

Liquidity

No recorded sale in the 12 months to Jul 2024. Last on record: 31 Jul 2024.

Counted against the newest sale in the corpus, not against today: NAPIC runs about three months in arrears, so a window ending today would quietly be a nine-month window and read low.

20223 · RM 221 psf
20231 · RM 243 psf
20243 · RM 223 psf

Quarterly medians · not a price trend

952133322022 Q1 — RM 164 psf, 2 sales2022 Q4 — RM 221 psf, 1 sale2023 Q4 — RM 243 psf, 1 sale2024 Q1 — RM 118 psf, 1 sale2024 Q2 — RM 309 psf, 1 sale2024 Q3 — RM 223 psf, 1 sale
2022 Q12024 Q3
5+ sales in the quarterfewer — plotted, never joinedNo run of 3 quarters is dense enough to draw a line through.

Each point is the median psf of what sold that quarter, so it moves with the mix as much as with price — a quarter in which the larger units happened to change hands reads low per square foot without anything having got cheaper. A line is drawn only along a run of three or more consecutive quarters that each carry five or more sales — two points are a difference, not a direction.

There is no mix-adjusted series for landed in Kedah long or clean enough to state a direction, so this page states none.

Distribution · 7 priced sales

RM 102–116 psf — 1 saleRM 116–131 psf — 1 saleRM 131–145 psf — 0 salesRM 145–159 psf — 0 salesRM 159–173 psf — 0 salesRM 173–187 psf — 0 salesRM 187–202 psf — 0 salesRM 202–216 psf — 0 salesRM 216–230 psf — 3 salesRM 230–244 psf — 1 saleRM 244–258 psf — 0 salesRM 258–273 psf — 0 salesRM 273–287 psf — 0 salesRM 287–301 psf — 1 sale
RM 102RM 301 psf

Each bar counts sales in a RM 14 psf band, measured against main floor area. The axis is trimmed to the 2nd–98th percentile, so a handful of sales fall outside it; they are still counted in every figure above.

Most recent sales · 7 of 7

DateTypeArea (sq ft)PricepsfTenure
31 Jul 20241 - 1 1/2 Storey Terraced1,000RM 223,000223Freehold
27 Jun 2024Low-Cost House680RM 210,000309Freehold
12 Jan 2024Low-Cost House680RM 80,000118Freehold
14 Nov 2023Low-Cost House700RM 170,000243Freehold
19 Oct 2022Low-Cost House680RM 150,000221Freehold
26 Jan 2022Low-Cost House700RM 160,000229Freehold
20 Jan 2022Low-Cost House900RM 90,000100Freehold

Others in Baling · landed

Where these numbers come from

Every figure on this page is computed from registered transactions published by the National Property Information Centre (NAPIC), Valuation and Property Services Department (JPPH), Ministry of Finance Malaysia, as open data. These are completed sales, not asking prices, and not properties currently on the market.
Areas are as published: main floor area. Nothing here is a valuation.